[1] Goldratt E. M. Critical Chain[M]. Great Barrington, MA:The North River Press Publishing Corporation, 1997 [2] Newbold R. C. Project Management in the Fast Lane:Applying the Theory of Constraints[M]. Boca Raton:The St. Lucie Press, 1998 [3] Herroelen W., Leus R. On the Merits and Pitfalls of Critical Chain Scheduling[J]. Journal of Operations Management, 2001,19(5):559-577 [4] Zhang J. G., Song X. W., Díaz E. Project Buffer Sizing of a Critical Chain Based on Comprehensive Resource Tightness[J]. European Journal of Operational Research, 2016,248(1):174-182 [5] 蒋红妍,彭颖,谢雪海.基于信息和多资源约束的关键链缓冲区大小计算方法[J].土木工程与管理学报, 2019,36(1):34-41 Jiang H. Y., Peng Y., Xie X. H. Calculation Method of Buffer Size on Critical Chain with Information and Multi-resource Constraints[J]. Journal of Civil Engineering and Management, 2019,36(1):34-41 [6] 卜朱镇,梁晓蓓,孟虎.基于多项目重要度的关键链识别改进方法及应用[J].工业工程与管理, 2021,26(5):187-194 Bu Z. Z., Liang X. B., Meng H. Improved Method and Application of Critical Chain Identification Based on Multi-project Important Degree[J]. Industrial Engineering and Management, 2021,26(5):187-194 [7] Aramesh S., Mousavi S. M., Mohagheghi V., et al. A Soft Computing Approach Based on Critical Chain for Project Planning and Control in Real-world Applications with Interval Data[J]. Applied Soft Computing, 2021,98:106915 [8] Nie X. T., Zheng Y., Gu X., et al. Calculation of Buffer Size on Critical Chain Based on Duration Distribution, Multiresource Constraints, and Relay Potential[J]. Scientific Programming, 2022,2022:6591223 [9] 施骞,王雅婷,龚婷.项目缓冲设置方法及其评价指标改进[J].系统工程理论与实践, 2012,32(8):1739-1746 Shi Q., Wang Y. T., Gong T. An Improved Approach for Project Buffer Sizing and Evaluation[J]. Systems Engineering-Theory&Practice, 2012,32(8):1739-1746 [10] 李洪波,林俏,曹依武.考虑技能因素的软件项目关键链缓冲区大小计算方法[J].工业工程与管理, 2021,26(4):195-201 Li H. B., Lin Q., Cao Y. W. Critical Chain Buffer Sizing Method in Software Projects Considering Skills[J]. Industrial Engineering and Management, 2021,26(4):195-201 [11] She B. L., Chen B., Hall N. G. Buffer Sizing in Critical Chain Project Management by Network Decomposition[J]. Omega, 2021,102:102382 [12] Li H. B., Cao Y. W., Lin Q., et al. Data-driven Project Buffer Sizing in Critical Chains[J]. Automation in Construction, 2022,135:104134 [13] Peng J. L., Peng C. Buffer Sizing in Critical Chain Project Management by Brittle Risk Entropy[J]. Buildings, 2022,12(9):1390 [14] Zhao Y., Cui N. F., Tian W. D. A Two-stage Approach for the Critical Chain Project Rescheduling[J]. Annals of Operations Research, 2020,285(1-2):67-95 [15] Hu X. J., Cui N. F., Demeulemeester E., et al. Incorporation of Activity Sensitivity Measures into Buffer Management to Manage Project Schedule Risk[J]. European Journal of Operational Research, 2016,249(2):717-727 [16] 丰景春,聂蕊琪,张可.双优化目标下基于合同项目异质性的关键链项目群差别缓冲监控模型[J].系统管理学报, 2023,32(5):901-915 Feng J. C., Nie R. Q., Zhang K. Differential Buffer Monitoring Model of Key Chain Program Based on Contracted Project Heterogeneityin Double Optimization Objectives[J]. Journal of Systems&Management, 2023,32(5):901-915 [17] 张俊光,万丹.基于缓冲账户差异配置的关键链项目动态集成监控[J].管理评论, 2023,35(1):233-242 Zhang J. G., Wan D. Dynamic Integration Monitoring and Control Based on Buffer Accounting Differential Configuration[J]. Management Review, 2023,35(1):233-242 [18] 李佳媛,何正文.基于资源缓冲的鲁棒性多模式项目调度优化[J].工业工程与管理, 2013,18(3):49-55 Li J. Y., He Z. W. Robust Multi-mode Project Scheduling Optimization Based on Resource Buffering[J]. Industrial Engineering and Management, 2013,18(3):49-55 [19] Shariatmadari M., Nahavandi N. A New Resource Buffer Insertion Approach for Proactive Resource Investment Problem[J]. Computers&Industrial Engineering, 2020,146:106582 [20] 章文芳,郁步前.基于约束理论的系统瓶颈资源时间缓冲设置[J].物流工程与管理, 2017,39(3):159-162 Zhang W. F., Yu B. Q. CCR Time Butter Setting of Manufacturing System Based on Theory of Constraints[J]. Logistics Engineering and Management, 2017,39(3):159-162 [21] 黄建文,黄敏,廖再毅,等.考虑人力资源柔性的关键链资源缓冲设置[J].土木工程与管理学报, 2019,36(4):47-53 Huang J. W., Huang M., Liao Z. Y., et al. Resource Buffer Setting Method of Critical Chain Considering Human Resource Flexibility[J]. Journal of Civil Engineering and Management, 2019,36(4):47-53 [22] Zhang J. G., Wan D. Determination of Early Warning Time Window for Bottleneck Resource Buffer[J]. Annals of Operations Research, 2021,300(1):1-17 [23] 冯芬玲,孙楠佳.考虑时间价值的中非多式联运路径与出海港选择[J].交通运输系统工程与信息, 2022,22(2):45-53 Feng F. L., Sun N. J. Time Value Based Route and Port Selection for China and Africa Multimodal Transportation[J]. Journal of Transportation Systems Engineering and Information Technology, 2022,22(2):45-53 [24] 张俊光,成诺.基于风险驱动的关键链项目监控周期设置[J].工业工程与管理, 2021,26(5):10-17 Zhang J. G., Cheng N. Determination of Critical Chain Project Monitoring Interval Based on Risk-driven[J]. Industrial Engineering and Management, 2021,26(5):10-17 [25] Khemakhem M. A., Chtourou H. Efficient Robustness Measures for the Resource-constrained Project Scheduling Problem[J]. International Journal of Industrial and Systems Engineering, 2013,14(2):245-267 |