[1] 王明喜,王明荣,汪寿阳等.最优减排策略及其实施的理论分析[J]. 管理评论, 2010,22(6):42-47
[2] Hua G. W., Cheng T. C. E., Wang S. Y. Managing Carbon Footprints in Inventory Management[J]. International Journal of Production Economics, 2011,132(2):178-185
[3] Keohane N. O. Cap and Trade, Rehabilitated: Using Tradable Permits to Control U.S. Greenhouse Gases[J]. Review Environmental Economics and Policy, 2009,3(1):42-62
[4] Du S. F., Zhu L. L., Liang L., et al. Emission-dependent Supply Chain and Environment-policy-making in The 'Cap-and-Trade' System[J]. Energy Policy, 2013,57:61-67
[5] Cummins M. EU ETS Market Interactions: The Case for Multiple Hypothesis Testing Approaches[J]. Applied Energy, 2013,111:701-709
[6] 牛海鹏,朱艳春,尹训国等.治污减排对经济发展影响的最新研究进展及启示[J]. 管理评论, 2011,23(7):34-42
[7] 袁永娜,石敏俊,李娜.碳排放许可的初始分配与区域协调发展——基于多区域 CGE 模型的模拟分析[J]. 管理评论, 2013,25(2):43-50
[8] 成思危.新能源与低碳经济[J]. 管理评论, 2010,22(6):4-8
[9] 周文泳,胡雯,陈康辉等.低碳背景下制造业商业模式创新策略研究——以卡特彼勒公司为例[J]. 管理评论, 2012,24(11):20-27
[10] 李怡娜,叶飞.高层管理支持、环保创新实践与企业绩效——资源承诺的调节作用[J]. 管理评论, 2013,25(1):120-127
[11] 唐拥军,韦玉.企业环保问题经营化战略与实施模式创新[J]. 管理评论, 2009,21(9):114-119
[12] 郭广涛,郭菊娥,柴建.西部发展节能服务的低碳效应及其政策研究[J]. 管理评论, 2010,22(6):71-76
[13] 朱庆华,耿涌.绿色供应链管理动力转换模型实证研究[J]. 管理评论, 2009,21(11):113-120
[14] Du S. F., Ma F., Fu Z. L., et al. Game-theoretic Analysis for An Emission-dependent Supply Chain in A 'Cap-and-Trade' System[DB/OL]. http://bs.ustc.edu.cn/UserFiles/File/2011121456104269.pdf, 2011
[15] Zhang J. J., Nie T. F., Du S. F. Optimal Emission-dependent Production Policy with Stochastic Demand[J]. International Journal of Society Systems Science, 2011,3(2):21-39
[16] Fahimnia B., Sarkis J., Dehghanian F., et al. The Impact of Carbon Pricing on a Closed-loop Supply Chain: An Australian Case Study[J]. Journal of Cleaner Production, 2013,59(15):210-225
[17] Giarola S., Shah N., Bezzo F. A Comprehensive Approach to The Design of Ethanol Supply Chains Including Carbon Trading Effects[J]. Bioresource Technology, 2012,107:175-185
[18] Li S. D., Gu M. D. The Effect of Emission Permit Trading with Banking on Firm's Production-inventory Strategies[J]. International Journal of Production Economics, 2012,137(2):304-308
[19] Abdallah T., Farhat A., Diabat A., et al. Green Supply Chains with Carbon Trading and Environmental Sourcing: Formulation and Life Cycle Assessment[J]. Applied Mathematical Modelling, 2012,36(9):4271-4285
[20] Chen X., Benjaafar S., Elomri A. The Carbon-constrained EOQ[J]. Operations Research Letters, 2013,41(2):172-179
[21] Zhang B., Xu L. Multi-item Production Planning with Carbon Cap and Trade Mechanism[J]. International Journal of Production Economics, 2013,144(1):118-127
[22] 李进,张江华.碳交易机制对物流配送路径决策的影响研究[J]. 系统工程理论与实践, 2013,33(1):1-9
[23] Sana S. S. A Production-inventory Model of Imperfect Quality Products in a Three-layer Supply Chain[J]. Decision Support Systems, 2011,50(2):539-547
[24] Yassine A., Maddah B. Salameh M. Disaggregation and Consolidation of Imperfect Quality Shipments in an Extended EPQ Model[J]. International Journal of Production Economics, 2012,135(1):345-352
[25] Soni H. N., Patel K. A. Optimal Strategy for an Integrated Inventory System Involving Variable Production and Defective Items under Retailer Partial Trade Credit Policy[J]. Decision Support Systems, 2012,54(1):235-247
[26] 操雅琴,张翠华.考虑质量缺陷和再制造的闭环供应链批量热力学模型与优化[J]. 系统管理学报, 2012,21(3):384-390
[27] Guchhait P., Maiti M. K., Maiti M. Production-inventory Models for a Damageable Item with Variable Demands and Inventory Costs in an Imperfect Production Process[J]. International Journal of Production Economics, 2013,144(1):180-188
[28] Skouri K., Konstantaras I., Lagodimos A. G., et al. An EOQ Model with Backorders and Rejection of Defective Supply Batches[J]. International Journal of Production Economics, 2014,155:148-154
[29] Hsu J. T., Hsu L. F. An EOQ Model with Imperfect Quality Items, Inspection Errors, Shortage Backordering, and Sales Returns[J]. International Journal of Production Economics, 2013,143(1):162-170
[30] Jaber M. Y., Zanoni S., Zavanella L. E. Economic Order Quantity Models for Imperfect Items with Buy and Repair Options[J]. International Journal of Production Economics, 2014,155:126-131
[31] Sarkar B., Gupta H., Chaudhuri K., et al. An Integrated Inventory Model with Variable Lead Time, Defective Units and Delay in Payments[J]. Applied Mathematics and Computation, 2014,237:650-658
[32] Wahab M. I. M., Mamun S. M. H., Ongkunaruk P. EOQ Models for a Coordinated Two-level International Supply Chain Considering Imperfect Items and Environmental Impact[J]. International Journal of Production Economics, 2011,134(1):151-158 |