[1] Goldratt E. M. Critical Chain[M]. Great Barrington, MA:North River Press, 1997
[2] Newblod R. C. Project Management in the Fast Lane:Applying the Theory of Constraints[M]. Boca Raton:The S t. Lucie Press, 1998
[3] Ashtiani B., Jalali G., Aryanezhad M., et al. A New Approach for Buffer Sizing in Critical Chain Scheduling[C]. Industrial Engineering and Engineering Management, 2007 IEEE International Conference on, 2007
[4] Herroelen W., Leus R. On the Merits and Pitfalls of Critical Chain Scheduling[J]. Journal of Operations Management, 2001,19(5):559-577
[5] Tukel O., Walter O., Sandra D. An Investigation of Buffer Sizing Techniques in Critical Chain Scheduling[J]. European Journal of Operational Research, 2006,172(2):401-416
[6] Mohammad F., BehzadAshtiani M. Aryanezhad Critical Chain Project Scheduling:Utilizing Uncertainty for Buffer Sizing[J]. IJRRAS, 2010,3(3):280-289
[7] Zhang J., Jia S., Diaz E. A New Buffer Sizing Approach Based on the Uncertainty of Project Activities[J]. Concurrent Engineering:Research and Applications, 2015,23(1):3-12
[8] Long L., Ohsato A. Fuzzy Critical Chain Method for Project Scheduling under Resource Constraints and Uncertainty[J]. International Journal of Project Management, 2008,26(6):688-698
[9] Li K., Chen Y. Applying Critical Chain in Project Scheduling and Estimating Buffer Size Based on Fuzzy Technique[C]. Proceedings of the 2007 IEEE IEEM, 2007
[10] Shi Q., Gong T. An Improved Project Buffer Sizing Approach to Critical Chain Management under Resources Constraints and Fuzzy Uncertainty[C]. International Conference on Artificial Intelligence and Computational Intelligence, 2009
[11] Zhao Z., You W. Application of Innovative Critical Chain Method for Project Planning and Control under Resource Constraints and Uncertainty[J]. Journal of Construction Engineering and Management, 2010,136(9):1056-1060
[12] 仲刚,乞建勋,苏志雄. 基于模糊工期的关键链缓冲区设置方法研究[J]. 技术经济, 2009,28(7):48-50
[13] 张延禄,杨乃定. 项目复杂性内涵,特征,类型及测度方法的研究综述[J]. 管理评论, 2013,25(9):131-139
[14] 杨青,吕杰峰,黄健美. 基于DSM的复杂研发项目价值流优化[J]. 管理评论, 2012,24(3):171-176
[15] Zhang J., Shi R., Diaz E. Dynamic Monitoring and Control of Software Project Effort Based on an Effort Buffer[J]. Journal of the Operational Research Society, 2015,66(9):1555-1565
[16] Kuo Y., Lu S. Using Fuzzy Multiple Criteria Decision Making Approach to Enhance Risk Assessment for Metropolitan Construction Projects[J]. International Journal of Project Management, 2013,31(4):602-614
[17] Khemakhem M., Chtourou H. Efficient Robustness Measures for the Resource-constrained Project Scheduling Problem[J]. International Journal of Industrial and Systems Engineering, 2013,14(2):245-267
[18] 管述学,庄宇. 熵权一TOPSIS模型在商业银行信用风险评估中的应用[J]. 情报杂志, 2008,(12):3-10
[19] 曲欢寿,郑建国. 基于熵权和TOPSIS的知识管理风险评价[J]. 情报杂志, 2009,(11):87-91
[20] 何鑫,朱宏泉,高成凤. 基于熵权法与TOPSIS法的房地产项目投资风险评价[J]. 商业研究, 2009,(3):105-108
[21] 黄灿宇. 基于熵权法的软件开发项目范围管理研究[D]. 北京化工大学硕士学位论文, 2012
[22] 李刚,程砚秋,董霖哲,等. 基尼系数客观赋权方法研究[J]. 管理评论, 2014,26(1):12-22
[23] 郭显光. 改进的熵值法及其在经济效益评价中的应用[J]. 系统工程理论与实践, 1998,18(12):98-102
[24] Pankaj J. Software Project Management in Practice[M]. 北京:清华大学出版社, 2002
[25] Zhang J., Song X., Díaz E. Buffer Sizing of Critical Chain Based on Attribute Optimization[J]. Concurrent Engineering:Research and Applications, 2014,22(3):253-264
[26] 施骞,王雅婷,龚婷. 项目缓冲设置方法及其评价指标改进[J]. 系统工程理论与实践, 2012,32(8):1739-1746
[27] 李伟涛. 软件项目进度风险分析与控制研究[D]. 山东建筑大学硕士学位论文, 2013 |