[1] Goldratt E. M. Critical Chain:A Business Novel[M]. Great Barrington:North River Press, 1997 [2] Herroelen W., Leus R. On the Merits and Pitfalls of Critical Chain Scheduling[J]. Journal of Operations Management, 2001,19(5):559-577 [3] Ashtiani B., Jalali G. R., Aryanezhad M. B., et al. A New Approach for Buffer Sizing in Critical Chain Scheduling[C]. IEEE International Conference on Industrial Engineering and Engineering Management, IEEE, 2007 [4] Newbold R. C. Project Management in the Fast Lane:Applying the Theory of Constraints[M]. Boca Raton:The St. Lucie Press, 1998 [5] 张俊光,冉文娟,贾赛可. 关键链项目缓冲设置研究述评与展望[J]. 管理评论, 2017,29(12):195-203 [6] Tukel O. I., Eksioglu S. D. An Investigation of Buffer Sizing Techniques in Critical Chain Scheduling[J]. European Journal of Operational Research, 2006,172(2):401-416 [7] 施骞,王雅婷,龚婷. 项目缓冲设置方法及其评价指标改进[J]. 系统工程理论与实践, 2012,32(8):1739-1746 [8] 林晶晶,周国华,杨琴. 考虑资源可替代性的关键链调度方法研究[J]. 管理学报, 2010,7(8):1233-1236 [9] Zhang J., Song X., Díaz E. Project Buffer Sizing of a Critical Chain Based on Comprehensive Resource Tightness[J]. European Journal of Operational Research, 2016,248(1):174-182 [10] 别黎,崔南方,赵雁,等. 关键链多项目调度中分散式能力约束缓冲设置法[J]. 管理工程学报, 2013,27(2):148-153 [11] 杨立熙,李世其,黄夏宝,等. 属性相关的关键链计划缓冲设置方法[J]. 工业工程与管理, 2009,14(1):11-14 [12] 单汨源,刘永,任斌,等. 基于不确定因素视角的关键链缓冲区研究[J]. 软科学, 2009,23(8):26-29 [13] 蔡晨,万伟. 基于PERT/CPM的关键链管理[J]. 中国管理科学, 2003,11(6):35-39 [14] Long L., Ohsato A. Fuzzy Critical Chain Method for Project Scheduling under Resource Constraints and Uncertainty[J]. International Journal of Project Management, 2008,26(6):688-698 [15] Zhao Z., You W., Zuo J. Application of Innovative Critical Chain Method for Project Planning and Control under Resource Constraints and Uncertainty[J]. Journal of Construction Engineering & Management, 2010,136(9):1056-1060 [16] 胡雪君,崔南方,赵雁. 基于活动工期风险和资源约束风险的缓冲大小计算方法[J]. 控制与决策, 2016,31(8):1513-1518 [17] Zhang J., Jia S., Diaz E. A New Buffer Sizing Approach Based on the Uncertainty of Project Activities[J]. Concurrent Engineering-research and Applications, 2015,23(1):3-12 [18] 张俊光,宋喜伟,杨双. 基于熵权法的关键链项目缓冲确定方法[J]. 管理评论, 2017,29(1):211-219 [19] Iranmanesh H., Mansourian F., Kouchaki S. Critical Chain Scheduling:A New Approach for Feeding Buffer Sizing[J]. International Journal of Operational Research, 2016,25(1):114-130 [20] Hu X., Cui N., Demeulemeester E., et al. Incorporation of Activity Sensitivity Measures into Buffer Management to Manage Project Schedule Risk[J]. European Journal of Operational Research, 2016,249(2):717-727 [21] Vonder S., Demeulemeester E., Herroelen W., et al. The Use of Buffers in Project Management:The Trade-off between Stability and Makespan[J]. International Journal of Production Economics, 2005,97(2):227-240 [22] Zhang J., Song X., Chen H., et al. Determination of Critical Chain Project Buffer Based on Information Flow Interactions[J]. Journal of the Operational Research Society, 2016,67(9):1146-1157 [23] Ibbs C., Wong C., Kwak Y. Project Change Management System[J]. Journal of Management in Engineering, 2001,17(3):159-165 [24] 赵振宇,吕乾雷. 项目进度控制的双边缓冲区方法研究[J]. 工程管理学报, 2010,24(5):559-563 [25] 梅林,刘欣,高亮. 基于模糊理论和帕累托法则的关键链缓冲估计探讨[J]. 统计与决策, 2016,22(4):81-84 [26] Beach R., Muhlemann A., Price D., et al. A Review of Manufacturing Flexibilit[J]. European Journal of Operational Research, 2000,122(1):41-57 [27] 张俊光,李凯. 基于替代资源变异度的增量缓冲设定方法研究[J]. 管理评论, 2019,31(3):258-264 |