[1] Goldratt E. M. Critical Chain[M]. Great Barrington, MA:The North River Press Publishing Corporation, 1997 [2] Newbold R. C. Project Management in the Fast Lane-applying the Theory of Constraints[M]. Boca Raton:The St. Lucie Press, 1998 [3] Kuo T. C., Chang S. H., Huang S. N. Due-date Performance Improvement Using TOC's Aggregated Time Buffer Method at a Wafer Fabrication Factory[J]. Expert Systems with Applications, 2009,36(2):1783-1792 [4] Yadav D. K., Kulkarni A., Yao H. A Comparative Study of Managing a Project Using Traditional Management Techniques and a Critical Chain Project Management Methodology in Aircraft Maintenance Field[J]. Journal of Transportation Technologies, 2022, 12(4):544-558 [5] Herroelen W., Leus R. On the Merits and Pitfalls of Critical Chain Scheduling[J]. Journal of Operations Management, 2001,19(5):559-577 [6] Bie L., Cui N. F., Zhang X. Buffer Sizing Approach with Dependence Assumption between Activities in Critical Chain Scheduling [J]. International Journal of Production Research, 2012,50(24):7343-7356 [7] Tukel O. I., Rom W. O., Eksioglu S. D. An Investigation of Buffer Sizing Techniques in Critical Chain Scheduling[J]. European Journal of Operational Research, 2006,172(2):401-416 [8] Shi Q., Gong T. An Improved Project Buffer Sizing Approach to Critical Chain Management under Resources Constraints and Fuzzy Uncertainty[C]//Proceedings of the 2009 IEEE International Conference on Artificial Intelligence and Computational Intelligence. Singapore:IEEE, 2009 [9] 施骞,王雅婷,龚婷. 项目缓冲设置方法及其评价指标改进[J]. 系统工程理论与实践, 2012,32(8):1739-1746 Shi Q., Wang Y. T., Gong T. An Improved Approach for Project Buffer Sizing and Evaluation[J]. Systems Engineering-Theory & Practice, 2012,32(8):1739-1746 [10] Poshdar M., Gonz??lez V. A., Raftery G. M., et al. A Probabilistic-based Method to Determine Optimum Size of Project Buffer in Construction Schedules[J]. Journal of Construction Engineering and Management, 2016,142(10):04016046 [11] 蒋红妍,彭颖,谢雪海. 基于信息和多资源约束的关键链缓冲区大小计算方法[J]. 土木工程与管理学报, 2019,36(1): 34-41 Jiang H. Y., Peng Y., Xie X. H. Calculation Method of Buffer Size on Critical Chain with Information and Multi-resource Constraints[J]. Journal of Civil Engineering and Management, 2019,36(1):34-41 [12] Zhang J. G., Song X. W., Díaz E. Project Buffer Sizing of a Critical Chain Based on Comprehensive Resource Tightness[J]. European Journal of Operational Research, 2016,248(1):174-182 [13] Ebufegha A. J., Li S. A Hybrid Algorithm for Task Sequencing Problems with Iteration in Product Development[J]. Journal of the Operational Research Society, 2022,73(7):1549-1561 [14] 张俊光,万丹. 基于缓冲账户差异配置的关键链项目动态集成监控[J]. 管理评论, 2023,35(1):233-242 Zhang J. G., Wan D. Dynamic Integration Monitoring and Control Based on Buffer Accounting Differential Configuration[J]. Management Review, 2023,35(1):233-242 [15] Hu X. J., Demeulemeester E., Cui N. F., et al. Improved Critical Chain Buffer Management Framework Considering Resource Costs and Schedule Stability[J]. Flexible Services and Manufacturing Journal, 2017,29(2):159-183 [16] 张静文,乔传卓,刘耕涛. 基于鲁棒性的关键链二次资源冲突消除策略[J]. 管理科学学报, 2017,20(3):106-119 Zhang J. W., Qiao C. Z., Liu G. T. Strategy to Eliminate the Second Resource Conflicts in Critical Chain Method Based on Robustness[J]. Journal of Management Sciences in China, 2017,20(3):106-119 [17] 程永波,宋露露,陈洪转,等. 复杂产品多主体协同创新最优资源整合策略[J]. 系统工程理论与实践, 2016,36(11): 2867-2878 Cheng Y. B., Song L. L., Chen H. Z., et al. Study on Optimal Resources Integration Strategy in Multi-agent Innovation Cooperation of Complex Products[J]. Systems Engineering-Theory & Practice, 2016,36(11):2867-2878 [18] 张俊光,李凯. 基于进度计划分形特征的缓冲确定方法研究[J]. 中国管理科学, 2020,28(7):212-219 Zhang J. G., Li K. Critical Chain Buffer Sizing Based on the Schedule Fractal Dimension[J]. Chinese Journal of Management Science, 2020,28(7):212-219 [19] 刘士新,宋健海,唐加福. 资源受限项目调度中缓冲区的设定方法[J]. 系统工程学报, 2006,21(4):381-386 Liu S. X., Song J. H., Tang J. F. Approach for Setting Time Buffers in Resources-Constrained Project Scheduling[J]. Journal of Systems Engineering, 2006,21(4):381-386 [20] 张俊光,张旭. 基于状态转移预测的关键链活动监控周期确定[J]. 管理评论, 2022,34(10):201-208 Zhang J. G., Zhang X. Determination of Critical Chain Activity Monitoring Cycle Based on State Transition Prediction[J]. Management Review, 2022,34(10):201-208 [21] Ma G. F., Gu L. Y., Li N. Scenario-based Proactive Robust Optimization for Critical-chain Project Scheduling[J]. Journal of Construction Engineering and Management, 2015,141(10):04015030 [22] Sarkar D., Jha K. N., Patel S. Critical Chain Project Management for a Highway Construction Project with a Focus on Theory of Constraints[J]. International Journal of Construction Management, 2021,21(2):194-207 |